Nossa Senhora da Guia Bridge in Ponte de Lima

  • Location: Ponte de Lima, Portugal
  • Solution: Bridges, Asset Management
  • Type: Road bridges, Rehabilitation
  • Promoter: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Client: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Scope: Reinforcement and Rehabilitation Design, Inspection, Safety Assessment, Anomaly Mapping, Materials Testing, Geotechnical and Hydraulic Studies
  • Project: 2009/ 2010
  • Construction: 2011/ 2012
  • Photography: Infraestruturas de Portugal SA
  • Contractor: OBRECOL – Obras e Construções SA
  • Dimension: 250m long, 58m max span
  • See on Google Maps

Nossa Senhora da Guia Bridge in Ponte de Lima

  • Location: Ponte de Lima, Portugal
  • Solution: Bridges, Asset Management
  • Type: Road bridges, Rehabilitation
  • Promoter: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Client: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Scope: Reinforcement and Rehabilitation Design, Inspection, Safety Assessment, Anomaly Mapping, Materials Testing, Geotechnical and Hydraulic Studies
  • Project: 2009/ 2010
  • Construction: 2011/ 2012
  • Photography: Infraestruturas de Portugal SA
  • Contractor: OBRECOL – Obras e Construções SA
  • Dimension: 250m long, 58m max span
  • Ver no Google Maps

The bridge of Nossa Senhora da Guia is located on the national road EN201, in Ponte de Lima, and its deck corresponds to a continuous box girder element, with five symmetrical spans of variable height, using reinforced and prestressed concrete, supported on columns and abutments also in reinforced concrete.

The deck is materialised through a box girder section with three webs, of variable height, and was one of the first bridges to be executed using the cantilever method.

Based on inspections carried out to identify and locate anomalies, as well as on structural evaluations carried out, rehabilitation and reinforcement procedures were recommended. FRP elements were bonded to the underside of the upper slab, and the longitudinal behaviour of the deck was improved by applying longitudinal prestressing cables to the deck. Elastomeric bearings were also redistributed in respect to its horizontal stiffness and hydraulic dampers were installed to improve its seismic behaviour.

Rehabilitation work was also carried out, such as local repairs and general painting of the structure. The roadway was also completely rehabilitated.

Other projects

Second bridge over the Matola River, pk26+900, on the Ressano Garcia Line

Second bridge over the Matola River, pk26+900, on the Ressano Garcia Line

See more
Walkway at the Bonança’s Insurance Company

Walkway at the Bonança’s Insurance Company

See more
São João Funicular

São João Funicular

See more
Bom Sucesso Walkway

Bom Sucesso Walkway

See more
Cadal Channal’s Bridge in Soyo, Angola

Cadal Channal’s Bridge in Soyo, Angola

See more
Bridge over Licungo River in N324 road

Bridge over Licungo River in N324 road

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional