Replacement of the Matola River Bridge at pk26+900 of the Ressano Garcia Line

  • Location: Maputo, Mozambique
  • Solution: Bridges
  • Type: Railway bridges, Rehabilitation
  • Promoter: CFM – Mozambique’s Ports and railways Authority
  • Client: CFM – Mozambique’s Ports and railways Authority
  • Scope: Structural Design, Inspection, Geotechnical, Drainage, Flood Protection and Hydrological Studies
  • Project: 2013
  • Construction: 2015
  • Contractor: Sinohydro
  • Dimension: 85m long, 17m max span
  • See on Google Maps

Replacement of the Matola River Bridge at pk26+900 of the Ressano Garcia Line

  • Location: Maputo, Mozambique
  • Solution: Bridges
  • Type: Railway bridges, Rehabilitation
  • Promoter: CFM – Mozambique’s Ports and railways Authority
  • Client: CFM – Mozambique’s Ports and railways Authority
  • Scope: Structural Design, Inspection, Geotechnical, Drainage, Flood Protection and Hydrological Studies
  • Project: 2013
  • Construction: 2015
  • Contractor: Sinohydro
  • Dimension: 85m long, 17m max span
  • Ver no Google Maps

The Ressano Garcia line provides communication between Mozambique and South Africa. It is a line used for heavy rail traffic, for transporting goods (ore and cereals) and passenger traffic. It allows the supply of services to "hinerland", exporters and with the need for fast transport and access to international traffic ports for the diffusion of products in foreign markets. This rail corridor controls the uninterrupted flow of goods from the Agro-Industrial catchment area south of Save and is therefore of essential importance.

The existing bridge was replaced by a double girder steel deck, composed of 5 simply supported spans with approximately 17m long. Each deck is composed of a grid system consisting of two 1.35m high web girders, transversal beams 3.00m apart, and two central stringers that receive the entire track system.

The decks are supported on reinforced concrete abutments, which were built in front of the abutments of the previous construction.

Other projects

Save river’s bridges

Save river’s bridges

See more
Rehabilitation and strengthening of 16 bridges along Limbe and Nkaya Corridor, in Malawi

Rehabilitation and strengthening of 16 bridges along Limbe and Nkaya Corridor, in Malawi

See more
Covilhã Public Garden Lift

Covilhã Public Garden Lift

See more
Pedestrian Bridge over Sizandro River in Torres Vedras

Pedestrian Bridge over Sizandro River in Torres Vedras

See more
Rehabilitation of the Cable-Stayed Bridge on the Arade River

Rehabilitation of the Cable-Stayed Bridge on the Arade River

See more
Second bridge over the Matola River, pk26+900, on the Ressano Garcia Line

Second bridge over the Matola River, pk26+900, on the Ressano Garcia Line

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional