Noticias - 2013

Mozambique Railway network
07/05/2013

Betar was commissioned the Study for Inspection and Creation of the Repairing Project of 10 bridges located on the Ressano Garcia and Goba lines.

The bridge construction Works started at 36+900, and the solution consists of a 3 spans metallic work measuring 15.00+50.00+15.00m.

The recommended solution for the central 50m span consists of a modified Warren type lattice with lower tray, 7.5m high and 5.0m wide between axes.  The side spans consist of full double beams. The pillars and meeting points were reinforced with vertical micro pilling.

The building methods were carried out with special attention not to keep the line interrupted for a long period of time. We used double side slides on the existing structure and on the central span.